References

More references
MY SKY
Heesen Yachts, Oss / Netherlands
The combination of material and design in the steam shower, the veneer layout of the ceilings and a rotatable sofa in the sky lounge at the wheelhouse deck and the stainless steel window linings are just some remarkable feature. In general this yacht shows a masterly combination of precious materials, noble design, refined technique and exquisite taste. Oss, March 2015. Heesen’s motor yacht "MySky" was handed over to her owner. The 51-meter-yacht accommodates up to 12 guests. Architect Erick van Egeraat created the ultra-modern, expressive interior. The sofa in the main salon is an prominent masterpiece creating an elegance style of the complete room. The Guest cabins are located on the lower deck and are also furnished to the highest standard.
Architects: Erick van Egeraat
Completion: 2015
SY M.Vorontsov
Balk Shipyard, Urk / Netherlands
Planning, production and installation of the complete Interior for the crew area, the owners area and the staircase. The Yacht was build out of traditional wood by Dream Shipyard in Turkey.
Architects: Ken Freivokh Design
Completion: 2013
MY Solandge
Lürssen Yachts
Planning, conception, production and installation.
Architects: Rodriguez Interiors, Dölker Voges (interior)
Espen Oeino (exterior)
Completion: 2013
MY Nirvana
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the the guest and VIP areas (6 cabins and bathrooms), cinema, tender garage, lazarette, main staircase and lobbies, as well as main salon, dining room, massage room, atrium, powder rooms and corridors.
Architects: Sam Sorgiovanni Designs, Fremantle / Australia
Completion: 2012
MY Quite Essential
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the owner´s area.
Architects: Reverberi Interior Design, Rom / Italy
Ken Freivokh Design, Sansbury Green, Hampshire / UK
Completion: 2011
MY Anastasia
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the owner´s area (2 bathrooms, bedroom, dressing room and study), cinema, main and dining saloon, galleys, main staircase, wheelhouse and captain´s area.
Architects: Sam Sorgiovanni Designs, Fremantle / Australia
Completion: 2008
SY Maltese Falcon
Perini Navi S.p.A., Viareggio / Italy
Planning, production and installation of the complete interior.
Architects: Ken Freivokh Design, Sansbury Green, Hampshire / England
Completion: 2006
MY Pelorus
Lürssen Yachts
Planning, production and installation of the owner’s area including the main staircase, main deck dining room, main deck saloon, dayhead lobbies, corridor and wellness area.
Architects: Terence Disdale Design, Richmond / GB
Tim Heywood Designs Ltd., Rutland / GB
Completion: 2003
MY Kismet
Lürssen Yachts
Planning, production and installation of the owner's and guest area, wheelhouse and staircase.
Architects: Espen Oino (exterior), Reymond Langton Design (interior).
Completion: 2014
MY Infinity
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Engineering, Production and Installation of main staircase, 4 salons, Tender garage, Gymnasium, Hospital, Toilets and Corridor.
Architects: Sinot Yachtdesign
Completion: 2014
MY Equanimity
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Beach lounge, SPA Area including Sauna, Steam and Massage rooms with Entrance and Shower. Guest and VIP Area, Staircase and Corridors.
Architects: Andrew Winch Designs
Completion: 2014
MY GALACTICA STAR
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the office and VIP area, (2 cabins and 2 bathrooms) and sky lounge.
Architects: Bannenberg & Rowell Design Limited, London/England
Completion: 2013
MY Crazy Me
Heesen Yachts, Oss / Netherlands
Architects: Cristiano Gatto (interior)
Completion: 2013
MY LADY L
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (2 guest cabins, 2 guest bathrooms, 2 VIP cabins and 2 VIP bathrooms).
Architects: Omega Architecten B.V., Druten/Niederlande
Completion: 2012
MY LADY PETRA
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the owner area (owner's suite, breakfast room, dresser and bathroom).
Architects: Bannenberg & Rowell Design Limited, London / England
Completion: 2012
MY SATORI
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (2 guest cabins, 2 guest bathrooms, 2 VIP cabins and 2 VIP bathrooms) as well as the sky lounge.
Architects: Remi Tessier, Paris / France
Completion: 2011
MY Josi
Lürssen Yachts
Planning, production and installation of the owner's office, formal saloon and mezzanine, dining room, main staircase, children's playroom, powder rooms, corridors and lobbies.
Architects: Bannenberg & Rowell Design Limited, London / England
Completion: 2010
MY LUNA
Lloyd Werft Bremerhaven GmbH, Bremerhaven / Germany
Planning, production and installation of the wellness and spa area, public saloon, dining room and wheelhouse.
Architects: Donald Starkey Designs, Jumeira / Dubai / UAE
Completion: 2010
MY SAN BERNARDO
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (2 guest cabins, 2 guest bathrooms, 2 VIP cabins and 2 VIP bathrooms).
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2010
MY JEMS
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (4 guest cabins and 4 guest bathrooms).
Architects: Omega Architecten B.V., Druten/Netherlands
Completion: 2009
MY PETRA
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (4 guest cabins and 4 guest bathrooms).
Architects: Omega Architecten B.V., Druten / netherlands
Completion: 2009
MY VIBRANT CURIOSITY
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the owner´s area, VIP area, main staircase, upper saloon, wheelhouse, captain´s area as well as the exterior furniture.
Architects: Nuvolari-Lenard Naval Design, Scorzè / Italy
Completion: 2009
MY 4YOU
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the sky lounge.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2009
MY CELESTIAL HOPE
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the owner´s area (bathroom, stateroom, his and her dressing rooms) as well as the guest area (4 guest cabins and 4 bathrooms).
Architects: INTARYA LTD, London/England
Completion: 2008
MY KITTY
Timmerman Yachts, Moscow / Russia
Planning and production of the owner’s area, VIP cabin, main saloon with dining room, main staircase and sky lounge.
Architects: LARVOR Interior Designers, Cannes / France
Completion: 2008
MY SIBELLE
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (4 guest cabins and 4 guest bathrooms) and crew corridor.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2008
MY NOURAH OF RIYADH
YAY Gemi Yapim A.S., Kocaeli / Turkey
Planning, production and installation of the owner’s area, staircase, cinema, dining room and main saloon.
Architects: Donald Starkey Designs, Jumeira, Dubai / UAE
Completion: 2008
MY AGRAM
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the guest area (4 guest cabins and 4 guest bathrooms) and crew corridor.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2008
MY MON PLAISIR
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the complete interior of the guest and crew area, galley and sky lounge.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2008
MY ALEXANDRA
Timmerman Yachts, Moscow / Russia
Planning and production of the owner’s area, guest area (4 guest cabins and 4 guest bathrooms), main staircase, main saloon with dining room and sky lounge.
Architects: Bannenberg & Rowell Design Limited, London / England
Completion: 2008
MY TAMSEN
Perini Navi S.p.A., Viareggio / Italy
Planning, production and installation of the owner´s area (2 bathrooms, dressing room, study and stateroom), 4 guest cabins, main lobby and main staircase.
Architects: Bernardo Chichi/Perini Navi S.p.A., Viareggio / Italy
Completion: 2007
MY 101
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the complete guest area interior.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2007
MY SEDATION
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the complete guest area interior.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2007
My Amevi
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of storage furniture in a high-gloss finish, as well as teak furniture elements incl. tables and the bar in the sun and upper deck exterior areas.
Architects: Nuvolari-Lenard Naval Design, Scorzè / Italy
Completion: 2007
My Galactica
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the complete interior of the owner’s and guest areas, sky lounge as well as the VIP stateroom.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2006
MY Kogo
Alstom Leroux Naval, Saint-Nazaire / France
Planning, production and installation of the owner’s and VIP areas, lobbies and main staircase.
Architects: Terence Disdale Design, Richmond / UK
Completion: 2006
MY Sirocco
Heesen Yachts, Oss / Netherlands
Planning, production and installation of the owner’s and guest area.
Architects: Omega Architecten B.V., Druten / Netherlands
Completion: 2006
MY LADY CHRISTINA
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the owner’s area, panoramic saloon and main galley.
Architects: Zuretti Interior Designers, Nice / France
Completion: 2005
MY Mary Jean
Astilleros de Mallorca S.A., Palma de Mallorca / Spain
Refit of the owner’s, VIP, guest areas as well as the captain’s area, sky lounge, bar, wheelhouse, exterior furniture, gymnasium, crew mess and crew cabins.
Architects: H2 Yacht Design, London / England
Completion: 2005
My Dilbar
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Turnkey performance of the captain’s and crew area and the wheelhouse.
Architects: Alberto Pinto, Paris / France
Completion: 2004
MY Alfa Four
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the complete interior and exterior furniture.
Architects: Andrew Winch Designs, London / GB
Completion: 2004
KREUZFAHRTSCHIFFE AIDA II & III
AKER MTW Werft GmbH, Wismar / Germany
Project development.
Architects: Partner - Ship - Design, Hamburg / Germany
Completion: 2003
MY PRINCE ABDUL AZIZ
Hephaestus Hellas Shipyards, Athen / Greek
Planning, production and installation of the prince`s day room, dining room, main deck saloon and reception area.
Architects: KCA International Designers Ltd, London / England
Completion: 2002
FERRY MT. ST. MICHEL
Van der Giessen-De Noord NV, Krimpen aan den IJssel / Netherlands
Planning, production and installation of the ceiling and wall panelling, doors as well as show-cases in the central hall, information centre and cabins.
Architects: AIA Architectes, Saint Herblain / France
Completion: 2002
MY SUNRISE
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the main staircase from the lower deck to the main and the upper decks.
Architects: The A Group, Monaco
Completion: 2000
MY Stargate
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the interior of the main and lower decks.
Architects: The A Group, Monaco,
Constantini International Projects S.r.l, Frascati (Rom) / Italy
Completion: 2000
MY CONSTELLATION
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning, production and installation of the interior of the main and lower decks.
Architects: The A Group, Monaco
Completion: 2000
MY Fortuna
Empresa Nacional Bazan, San Fernando / Spain
Planning, production and installation of the galley, starboard corridor, portside corridor and the wheelhouse.
Architects: Celeste Dell’Anna Design, Mailand / Italy
Completion: 1999
MY Lady S
Oceanco Alblasserdam Yachtbuilding B.V. Alblasserdam, Netherlands
Planning and production of the renovation work of the lower deck guest area, main deck, main saloon, upper deck, upper saloon and staircase from the lower to the sun deck.
Architects: Jacobsen Architecture, LLC, Washington / USA
Completion: 1998

More references
Penthouse, San Francisco / USA
San Francisco, USA
Planning, production and installation of the guest rooms, living- and dining area, the owner's bedroom, library, bar, kitchen, private office and entrance area.
Architects: KFD, Sansbury Green, Hampshire / UK
Completion: 2011
private residence, London
London, England
Planning, production and installation of the kitchen, bathroom, his and her dressing rooms, owner’s bedroom, entrance hall and staircase.
Architects: H2 Yacht Design, London / UK
Completion: 2006
Private Villa, Bodrum (Turkey)
Bodrum, Turkey
Planning, production and installation of the interior and pergolas.
Architects: Gerner, Kronick & Valcarcel, Architects, PC, New York / USA
Completion: 2002
Liebling Residence, New York
Central Park West, New York / USA
Planning and production of the complete bathroom and sleeping area as well as the gallery.
Architects: Gwathmey Siegel & Associates Architects IIc., New York / USA
Completion: 2001
Private house, Istanbul, Turkey
Istanbul / Turkey
Planning, production and installation of the interior furnishing, among other things, including burglar-proof acoustic protection doors, cabinet and bar systems as well as private rooms, dressing and personnel rooms.
Completion: 2011
Private residence, Croatia
Croatia
Design, planning, production and installation of the complete interior as well as coordination of dry construction, heating, air conditioning, electrical installation and natural stone work. The building is subdivided into private and guest areas, office and corridor.
Architects: Sinnex
Completion: 2009
Private residence, Heidelberg
Heidelberg / Germany
Design, planning, production and installation of living and sleeping areas.
Completion: 2004
TAVITIAN TOWNHOUSE, New York
New York / USA
Planning and production of the private office, study, library, dining room, kitchen and wine-cellar.
Architects: Swanke Hayden Connell Architects, New York/USA
Completion: 2002
STEEL APARTMENT, NEW YORK
New York / USA
Planning and production of the entire living and sleeping area.
Architects: Gwathmey Siegel & Associates Architects IIc., New York / USA
Completion: 2000
Abullah Efendi, Istanbul
Istanbul / Turkey
Planning and production of the complete interior of a private villa.
Architects: Gerner, Kronick + Valcarcel, Architects, PC, New York / USA
Completion: 1998
Apartment 17A&B, New York
New York / USA
Planning and production of living and sleeping areas including the bathrooms of a luxury condominium.
Architects: Gwathmey Siegel & Associates Architects IIc., New York/USA
Completion: 1998
Apartment 2001, New York
New York / USA
Planning and production of the living and sleeping areas as well as the bathrooms of a luxury condominium.
Architects: Gwathmey Siegel & Associates Architects IIc., New York/USA
Completion: 1996

More references
ADMINISTRATIVE BUILDING / PRIVATE RESIDENCE, CROATIA
Croatia
Design, planning, production and installation of the complete interior as well as coordination of dry construction, heating, air conditioning, electrical installation and natural stone. The building is subdivided into private and guest areas, office and corridor.
Architects: Sinnex
Completion: 2009
Georg-Friedrich-Händel Hall
Halle an der Saale / Germany
Planning, supply and installation of various interior trades such as woodwork, plasterwork and painting.
Architects: Braun & Schlockermann und Partner GbR, Frankfurt am Main / Germany
Completion: 1999
Private Jet A-319
Woensdrecht Air Base
Planning, Production and Installation of the interior.
Completion:
SY M.Vorontsov
Balk Shipyard, Urk / Netherlands
Planning, production and installation of the SPA-Area (SY M.Vorontsov).
Architects: Ken Freivokh Design
Completion: 2013
ALMOJIL INVESTMENT
Dubai, UAE
Planning, production and installation of 2 management boardrooms.
Architects: BIELINGDESIGN, Munich / Germany
Completion: 2007
LVA SCHWABEN HEADQUARTERS
Augsburg, Germany
Planning, production and installation of custom made cabinet elements.
Architects: HASCHER JEHLE Architektur, Berlin / Germany
Completion: 2003
INVESTCORP INTERNATIONAL, INC.
280 Park Avenue, New York / USA
Planning and production of the reception, rotunda, library, stairs, cabinets, doors and walls.
Architects: Skidmore, Owings & Merrill LLP, New York / USA
Completion: 2001
BOSTON UNIVERSITY
Boston, USA
Planning of the entire executive wing.
Architects: Architects: N2 Design & Architecture, P.C., New York / USA
Interior Design: UAM Ltd. Umberto A. Marcucci ASID, New York / USA
Completion: 2001
IS-Bank
Maltepe, Istanbul / Turkey
Office of the president, reception, boardrooms and conference rooms on 21st, 37th and 41st floors.
Architects: RMJM, New York / USA
Completion: 2000
AOL - Time Warner
25 Columbus Circle, New York / USA
Planning and production of the executive boardrooms and executive offices.
Architects: Mancini • Duffy, New York / USA
Completion: 2000
E.ON Headquaters
Berlin / Germany
General contractor function including planning, production, organization, supply and installation as well as the supervision of different trades such as woodwork, glass, floor screeding, dry constructions, natural stone and metal work for the boardrooms and reception area.
Architects: Wilfried Köhnemann, Hamburg / Germany
Completion: 2000
LINCOLN FINANCIAL GROUP
Market-Frankford Line, Philadelphia / USA
Planning and production of the wall panelling, doors and workstations.
Architects: Mancini • Duffy, New York / USA
Completion: 1999
CEMEX
Monterrey / Mexico
Planning and production of the meeting and conference center interior.
Architects: Phillips Janson Group Architects PC, New York / USA
Completion: 1997
What our customers say...
Chris Gartner
Captain (Maltese Falcon)
„Working with Sinnex is not only a lesson in professionalism, but it is a lesson in team work. Through our build the Sinnex group exemplified what it takes to get a world class project such as the Mega Sailing Yacht the Maltese Falcon started and completed. It is a common feeling throughout the build team that it was a pleasure to work with Sinnex and I would highly recommend them if you want to have the interior of your yacht, aircraft, office or home finished in time and in the most beautiful way! It is hard to beat the best!!!!“
Tom Perkins
„Sinnex has crafted two large and complex installations for me; they are both stunningly beautiful and completed to the highest standards of quality. My yacht the Maltese Falcon is the largest sailing vessel in the world. Last year it was designated, by a panel of designers and naval architects as the finest yacht of any kind ever created. Doubtless her interior built to the top designer, Ken Freivokh’s drawings is part of the mystique the panel discovered---it is superbly done by Sinnex (on time and on budget). In 2010 I again retained Sinnex to create the interior of my penthouse atop the Millennium Tower in downtown San Francisco, again to Freivok’s designs. Perhaps it seems unusual to use a contractor so far away from the build site, but the thoroughness of the preparations by Sinnex made this choice cost effective and, of course the quality was simply unattainable by most other competitors. I cannot recommend this excellent firm more highly.“
Jonny Horsfield
Owner and Design Director

„I had the pleasure of working with Sinnex on a major refit of yacht Philosophy, as well as a residential refurbishment in London. Though it was a few years ago now I still remember like it was yesterday the professionalism of their services, from incredible attention to design detail through perfection of construction, finishing with an installation of both speed and total dedication to quality. It goes without saying that I would recommend Sinnex for any interior fitout project again and look forward to working with them again soon.“
SINOT Yacht Design
"We would like to thank you for all the assistance you provided throughout the build of the last Oceanco Newbuild. When our collaboration started at the kick-oft meeting back in December 2012, we could only have imagined the drive and determination that was going to be brought to the project by all involved; it has certainly been a rewarding process. To briefly re-cap the journey we took together; following the kick-off, the process of drawing reviews and revisions started and then materials were presented and checked. Four months later, in April of 2013, we were able to see the first results of the work in the 1:1 mock-up. This is when we could see the first real impression of the design and the quality of the interior and see just how special this project was going to be! Subsequently, marble selections took place. The installation on board started and the interior was completed little by little, space by space. The quality inspections on board allowed us to ensure the extraordinary quality of the interior and overall result as it slowly came together. What struck us most is the love and attention that your company has given to every detail of the interior. All of the work combined has formed a fabulous and truly unique end result. We feel privileged to have worked together with you, thank you!"
Fiona Diamond
Founder and Director of Seymour Diamond

"Seymour Diamond have now completed the interior design of Feadship’s recently launched 92M Royal Romance with excellent interior joinery by Sinnex. I have been exceedingly impressed with the quality of workmanship, especially as the design consisted of so many challenging intricate details. I have been collaborating on interior projects with Sinnex for over 10 years, namely MY Pelorus and MY Kogo and they continue to show their ability and versatility in creating interior joinery in a wide variety of styles, all executed to the highest standard."
Carlo Nuvolari-Duodo
Naval Architect & Senior Partner
" It would be too obvious to just spend words of appreciation about the quality, the high level of finishing, the perfection etc. etc. that Sinnex can achieve when is building our designs. What really count for us as designers is that we feel that once our project is in Sinnex hands, is in safe hands, because they will completely understand its essence and will execute it exactely as we had in mind."
Andrew Winch
Founder and creative director of Andrew Winch Designs

"Sinnex are a great team to work with. They are a company committed to finding the very best solutions to often difficult design and finish challenges. Sinnex are commitment to helping the designer fulfil the wishes of the client and are first class with a wide knowledge base. Access to varied specialist skills required to fulfil the ever increasing demands of the yacht world is admirable. AWD very much enjoy the experience of working with Sinnex and would welcome further collaboration. Andrew Winch and the team recently had the privilege to work with Sinnex to complete a significant portion of the Interior for the 90m Equanimity. Not only did they create a superbly executed interior, they helped create a great working relationship with the entire design and project team. They are led by an enthusiastic and professional management team who took great interest in all aspects of the project. Being gracious hosts to all that attended their offices allowed for efficient and enjoyable meetings throughout the project. Sinnex where always ready to help should an issue arise, striving for quality and well considered resolutions. This being the first PYC yacht to be delivered in the Netherlands, these solutions were not always straight forward, however the abundance of knowledge and experience within the company, aided in creating this world class yacht. It was a pleasure to work with Sinnex and we look forward to the next project together."
Marcel Onkenhout
CEO of Oceanco

"Oceanco and Sinnex have worked closely together on over a dozen extraordinary and innovative yachts for over 15 years. We share a strong and professional working relationship grounded in a deep seated confidence and trust in each other’s capabilities and high standards, which has led both companies to not only enjoy many successful deliveries of award winning yachts but to increase the level of quality to new standards within the yacht industry."
Pascale Reymond & Andrew Langton
Designer team of Reymond Langton Design

"We have been working with the Company Sinnex for many years and their quality of craftsmanship and project management is superb. We are very proud of all the yachts we have done together. Sinnex interior on the 134m Serene and 95m Kismet is excellent and brought us lot of recognition and industry awards. We are truly looking forward to our next delivery, 91m Project Orchid, which will even be more special."
Ken Freivokh
BSc March MDesRCA MCSD RIBA
Collaboration with Sinnex – 88m Maltese Falcon and 65m Mikhail S Vorontsov
I am pleased to confirm a very successful collaboration with Sinnex on both the Maltese Falcon Project and the somewhat smaller Vorontsov. Both were finished to a high degree of perfection, and received many awards, some specifically for the interior. It is sometimes the case that attention is fully focused only on the actual finish of the joinery, and the engineering work which has been completed ahead of putting work in had often neglected or not fully appreciated. In my opinion, that is perhaps the most essential contribution that an outfitter can bring to a project. Sinnex managed to not only engineer their side of the fitting out, but in fact played a vital coordination role with the yard’s engineers, electricians, air conditioning installers, plumbing, etc., to ensure that everything would fit perfectly, and that the sequence of work was the most effective. Sinnex also set all the essential datum lines on the interior, which were later followed by all the other disciplines. The process included thought and anticipation, such that if essential engineering works, such as underwater lights, required maintenance or replacement, the joinery was designed to allow easy access with no damage to any of the finished parts.
We were so pleased with the Sinnex work that we also invited them to work alongside our team on very high end residential projects, which were finished to a very high standard. In summary, therefore, I would describe their work as intelligent outfitting of the highest quality.
